4. Movement or destruction of all large structures that had been moved or damaged by blast. 5, Recovery of stalled radio controlled tank from crater (Only at X Island). 6. Preserving special concrete structures by filling metal tubes with a rust preventative and applying asphalt coating, inside and out, followed by sand palliative. “7, | . Disposal of contaminated, 5 generators, 2 air conditioning units, 2 search lights by dumping in deep water of lagoon. 8. Recovering for further use 1 generator from blast building and neutron cable winch. “The above work was accomplished with 6 men, 1 DUKW, 1 crane and 1 dozer in one or two days! time under directions of the one field officer who had commanded the island previously tested. Section Vi-c