Stations would have to be backfilled, graded and stabilized with the
soil-cement mixture that had proven itself during previous experiments.
All available personnel were assigned to this job and a weeks
time saw it completed.
An emergency alert plan was published locally by the CIC and MP's
on 24, March and all personnel briefed in its functions.
New water distilling units were installed at this time greatly
alleviating the stringent condition the entire command had undergone
in water conservation during the previous months.
The I & E Lectures given by Col. MQQBMMM, "Something about the
Atom" and Major GMA, “Atomic Energy and National Defence" during the
month of March did mich to enlighten all concerned on what the assignment was about and where it fitted into the world today.
On 30 March an entry list was submitted to CIC in accordance with
pertinent directives, authorizing listed personnel only to travel between
the islands.
|
“
*
Camp was broken on 6 April and Company Headquarters with all
personnel departed Aoman for Eniwetok.
All attached men were returned
to their units and the company welcomed back those of its members who
had been attached to other organizations.
Part II Note: Technical data from the Engineer's report has been
omitted since it duplicates that contained in the report of the Task
Force Engineer.