construction work, a heavy equipment platoon of one officer and 25
enlisted men and the following heavy equipment:
1
Compressor, air, trk mounted, 105 cu. ft.
1
Compressor, air, trk mounted, 310 cu. ft.
2
Grader, road mtzd. diesel
2 Scraper, road, towed 8 cu. yd.
2
Crane, crawler mounted w/clamshell ~
FF
Shovel, crawler mounted
Trailer, lowbed 20 ton
DD
1
Trailer, 10 ton
WW
Crane, revolving trk mounted
Tractor, crawler w/bulldozer
oO
1
Trk, cargo, 24 ton 6 x 6
°
Ba
Trk, dump, w/winch, 23 ton 6 x 6
PF
of
Trk, prime mover 6 ton 6 x 6
Survey and layout was accomplished by a first order survey team
from the United States Coast and Geodetic Survey under the supervision
of Mr. iii»: the Army Map Service.
Erection of a 200 foot steel tower and a 75 foot photo tower,
both located on the north end of the island was accomplished by con-
tract with MK~PK Company, USA, under the supervision of Col Sze,
Western Oceans Division, Corps of Engineers.
This contractor also
erected the photo tower on Aniyaanii Island.
Panel forms for all concrete structures were prefabricated on
Engebi Island and transshipped to Runit by a detail of five enlisted
men.
.
Reinforcing steel and hardware such as nails, bolts, tie wire
Seckiony: vibS3 2»