TABLE :
REDWING SHOT SLHEDULE
(L = LASL, U = UCRL, E = Entwetok, B = Bikint)
Model! and
Laboratory
Shot
Name
Probable
Yie
nts
(2)
Location
Lacrosse
Cherokee
Runtt (E) ground
Namu (B) 5000 ft air burst
Zuni
Eninman (B) ground
Date
Actual
No
Yes
5/1
5/1
§/28
5/28
Yes
5/15
5/28
5/31
6/5
Flathead
South of Yurochi (B) barge
6/12
6°10
Runit (E) 700 ft air burst
6 i6
6/16
Mike craier, west oi
Yes
Datel5)
Actual (4)
Shot Time
5/1
5/1*
0625:05
O55!
5/8
5/23
5/26
6/1
5/23
5/28
5/8
0556
§/30
6/2
0626
6/7
6/i4
6/8
6/13
VA
0056
0606
0608,
6/7
5/18
6/22
6/22
3
No
No
Yes
5/1
ane
6/8
7/3
V8
Yes
Wfi
6/20
oso ~
South of Yurochl (B) barge
Halfway between Yurochi &
7/il
7/21
7/9
7/18
Yes
No
6/18
—
6,8
Ut
0556
0546
Mike crater (E) barge
1/22
1/2, 1/20
No
6/11
6/12
0616
Namuw (B) barge
6/22
6/26
3
Yea
(7)
67
6/18
0756
0615:05
1255:05
Yes
Yes
Teiteiripucchi (£) barge
6/12
6/14
Yes
No
No
Op Plan
6/12
6/14
Rujoru (E) 200 it tower
South of Yurochi (B) barge
Eberiru (E) 300 ft tower
&L-
(10/11/55)
4/29
5/9
$/28
§/31
6/6
Runit (E) 200 ft tower
Aomon (E) 300 {t tower
Revision"*)
5/5
5/21
Aomon (E) 200 ft tower
Runit (E) 200 ft tower
Bogon (E) ground
Blacidoot
Listed in
Fired Ready Date Concept(3)
Yuma
Erie
Seminole
0626
1126
1314
oposed Shots, Eventually Deleted from Schedule
-~
senna reer Se
Pawnee
Engebi (E) ground
---
o--
No
Pueblo
Bogairikk (E) ground
---
--+
Yes
---
wee
Runit (E) 100 it tower
one
o--
Yes
ee
ase
Runit (E) 100 ft tower
---
oes
Yes
ane
wee
Engebi (E) ground
---
ose
No
one
-+e!
Engebi (E) ground
-~-
---
No
Unspecified
a--
Unspecified
nee
Notes
Apache) was originally planned as a LASL model.
(2)
Probable yield limits, estimated before the shot, for construction, instrumentation, evacuation, aircraft positioning, fallout
prediction and other purposes.
(3) CTG 7.1 General Concept No. 1-55 (dated 4/12/55).
(4)
(5)
Later, by agreement between LASL and UCRL, it became a
orders were given.
First shot at each atoll was to be ready 4/15/56 bul no shot ;dates or
Ready dates in Revision No. 4 (dated 10/11/55) to CTG 7.1 General Concept No. 1-55.
CTG 7.1 Operation Plan No. 1-56 (dated 1/25/56). Later dates of UCRL small shots caused by December 1955 estimate of
UCRL that this program was a month behind schedule. Dates listed are from Revis on No. 2 to Op Plan (dated 2/4/56).
(6) Eniwe
(Zone-12) dates and times are use
e
‘n
postponed at H-3 min, 7/2/56f