CHAPTER Ii, SECTION 3 PARTICIPATION: 20 and 33 DESIGN PSI: 3 psi CONSTRUCTION: 2-19-58/4-20-58 To obtain this station, a 14x37-foot woodframed room was added to Station 1520. The structure was built over an extension of an existing concrete floor slab and foundation. Height of the building was 8 feet with a 7-footwide by 1314-foot-long area at one side rising 12 feet. The structure was of wood stud wall construction with plywood sheathing and flat roof joist framing with plywood sheathing and composition roofing. Two structural steel mirror frame assemblies were provided inside the structure. STATIONS: 1523.01 through 1523.04 SITE: Yvonne USER: LASL PURPOSE: Mirror Towers and Shelters Station 1522 40% Complete. zontal member were provided on each of the four sides of the tower. Each tower frame and footing was housed in a 1314-foot-square wood frame shelter built over a continuous foundation PARTICIPATION: 20 DESIGN PSI: (Neg. No. W-V-240-6) Figure No. 2-48. None CONSTRUCTION: 2-15-58/4-20-58 Four identical steel frame towers with wood frame enclosing shelters were provided for Stations 1523.01 through 1523.04. Tower footings were 10-foot, 2-inch-square by 3-foot-thick re- wall and footing and rising to a lowerlevel plate line at Elevation+31.0 support of a flat slope roof. The shelter framing was of wood stud wall construction with plywood sheathing and compo- sition roofing. Each shelter had a wood frame and plywood platform interior platform at Ele- vation +24.0. Access to the tower base and upper inforced concrete. Tower framing consisted of four 6-inch-diametersteel pipe columns on 9-foot centers at their base Elevation + 6.5, rising to level platform was provided by doorway openings, vertical wood ladder to the upper level, and grating at Elevation +26.0. Two panels of angle X-bracing with one intermediate hori- spacing pattern. The station shelter south walls support a 5-foot-square steel platform frame and steel rung ladder to the base level. The four stations were grouped in a close staggered away from Station 20 were extended to meet the (Neg. No. W-V-258-10) Figure No. 2-49. 1523 Stations — 95% Complete. Page 105

Select target paragraph3