eee ot atel iAASi es AE EIN ety cele we eae
wf
PART Ii, CHAPTERS 1, 2 and 3
1.1
The HARDTACKtest series at EPG
.
was designed to achieve the following objectives which are Vital to the continued rogress_in research
an
evelopment of
atomic
To test-proof certain weapons in
stockpile or to be stockpiled in the *
wo
a.
@
oe
oe
@
AEC Staff Paper 952/19 (Test Activities
for Calendar Year 1958) secured formal
approval for Operation HARDTACK,which included the following atomic detonations:
od
&
wv
vw
@v
@
@
@
@
@
FIRM LABORATORY SHOTS
oe
@
2.1
ORIGINAL CONCEPT
9 sponsored by UCRL—all on
barges
ws
b.
To continue developmental research.
on promising weapons;
c.
To continue long-range weapons research of new techniques, ideas, and '
designs; and
d.
To conduct a weapons effects
gram required by DOD.
pre
CHAPTER 2
TEST EVENTS
8 sponsored by LASL — 7 on barges;
1 on surface
v7,
near future;
weapons and in the improvement of atomic deenise:
vor
F&
w&
rv
=F
CHAPTER 1
GENERAL OBJECTIVES
1 May 1957,
SHOT EXPERIENCE
2.2
The following is a summary of shots
actually detonated at EPG during Operation HARDTACK (Operational phase 15 March
1958 — 15 September 1958):
LABORATORY DIAGNOSTIC
SHOTS
LASL sponsored 13 barge shots, of
which one was a one-point safety
shot.
CONTINGENCY LABORATORY
SHOTS
LASL sponsored 2 ground shots.
3 sponsored by LASL — 2 on barges;
1 in shallow water or in a barge
UCRL sponsored 13 barge shots.
UCRLsponsored 2 ground shots, of
which 1 was a “zero” shot.
DEMONSTRATION SHOT
(UN OBSERVERS)
DOD sponsored 2 underwatershots.
1 shot on a barge sponsored by
AEC
DOD EFFECTS SHOTS
DODsponsored 3 high altitude shots.
Total — 35°
2.3
3 shots at high altitude
2 shots underwater
These 26 shots were contemplated as of
Figs. 2-1A and 2-1B,entitled “Shot Delay Chart,” include all of the events of
Operation HARDTACK,Phase I, with an in-
dication of the various types of delays preliminary to the actual detonation.
CHAPTER 3
SUMMARY OF RESULTS
Details of the original scientific concept
of the Operation, complete descriptions of test
devices, device yield, and performance data are
omitted from this report, since details of this
information have been included in the Final Op-
eration HARDTACK Report of CTG 7.1 to
CJTF-Seven. This information is available from
CTs 7.1 of JTF-Seven on a “need-to-know”
asis.
Pages 31-32