ctManat ee”
PART I, CHAPTER 7
CHAPTER 7
REFERENCES
7.1
The Report of the Manager, ALO, is
limited to those functions which are the
responsibility of TG 7.5; hence, the reader re-
quiring further information relating to Operation
HARDTACKis referred to the following listed
TITLE
Final Report of the Commander, TG 7.1 (Scientific)
TG 7.1
NS
Fina] Report of the Commander, TG 7.2 (Army)
TG 7.2
SO
Final Report of the Commander, TG 7.3 (Navy)
TG 7.3
FF
Final Report of the Commander, TG 7.4 (Air Force)
TG 7.4
7
Final Report of the Commander, JTF-Seven
CJTF-Seven
eo
AUTHOR
Report on “Study of the Safety Aspects of UHA and VHA
for Operation HARDTACK”by Safety Working Group
(21 Qct. 1957)
AFSWP
Final Report — ‘Operation HARDTACK CommunicationsElectronics”
JTF-Seven
Completion Report, Operation HARDTACK, Phase I
HE&N
Monthly Narrative Reports (January 1957 - October 1958)
HEN
10.
“TG 7.5 On-Site Rad-Safe Report”
HE&N, and OTO, ALO
11.
Long Range Improvement Planning at EPG, 1959 through
1962, (June 1958) - Volumes I and II
HEN
12.
Meteorogical Report on Operation HARDTACK (6 volumes)
JTF-Seven
13.
Status of WT Reports.
AEC Technical Information
Service Extension,
Oak Ridge, Tennessee
Pages 27-28
j