G- OPERATIBG POINT
Operating equipment remeined at ec’ satisfactory or better
level daring the report period.
The power end dlatillation plant operated by Holmes &Harver,
funstioned satisfactorily during the period. One power failure was
exporicrtod during this tine during a heavy rainstorm.
os
Cremnisations equipzent oortimued to function mort satisfactorily.
Local wire fasiiities opersted whthout any incideat of note, excepting. 7
possibly a short otreutt of a. telephone sable to Air Fores headquarters,
auc to exocesive seepage,
However, this failure was loceted and
repairs mie in five hours,
-
‘
oo,
Teletypewriter and radio oirouits were om the Hote nest
satisfactory.
A oonspicious exception to this was the AACS radio
oiroult, which caused soneconcern because of several “dead” areas, © |
Technicians of AACS were attamting to solve this problea during
Cog o
the report period, but uo lasting progress waa males Since ae . ooo
FT Ans
ahanrel is of great taportanse te all atroraft, both wes wt Aosaty
~ aone Vee
Rat
continued effort to ccrrest the atetioultios masplanned forthe
immediate future,
wo
3
BEST AVAILABLE COPY
Coen
ant
RESRPNIN
erp pe
ee Aen
orm a pan
“OAS
oy
oa OtopPay
SO fo ov:
ER
GceCi4