ee
Be
BUILOeUr IN SUPPLIES, MATERIAL AND SPECIAL OPERATING EQUIPMENT
A major result of the visit by the Task Porse Commander and —
hig staff was the clarification of the actions uecesuary a the
port of the Task Group to provide for its om build-up, and the
procurecont of those items which other Task Groups and the Task
Force will receive from T 152.20
Following the receipt of those
instrustions, requisitions were prepared and forwarded during the
paxth of February to cover all known requirenents for Engineer,
Quartermester, Ordnance, Sigcal and Transportation Corps property.
The items requisitioned fell basically in these oatezorioss
ENGINEER « Lucber, cement, parts, maintenance and building
materials.
QUASTERMASTER « Clothing and equipaze, tentage, ecneral
supplies and spare partes
,
_ ORMARGE @ Vehicles and spare parts, weapons, annmunition
end spare parts.
SIGHAL «
> Rgulpaent aad spareparts.
TRANSPORDATION CORPS = stovedors"equppet.
oO .
PORTCOMPANY AND SAUCK COMPASY = 1/0 end ® requirecente for...3
these mits, bothdue a ‘arrive in the nearfuture, were also
requisitioned.
,
"
“RQ, JTF 182
~ Bequirenints listed by this unit included a
variety of materiel fron ‘the technical services, a2 well as wavy
BEST AVAILABLE Copy
REGRADED LINCLAS® FEO ORDER
SEC ANN BV D7 TR
.
Eccl’
Wire
we
OS
-