MITERIEL SHIPMENTS TO FORMARD ARRA
During the report period, materiel shipments were at & some-
what accelerated pace over the previous period.
This applied
,
especially to shipments % Holues and Narver of construe tion materiel.
fe
Norual shipments of rations and routine guppliss were made te
the nilitary.
The USNS Morris Grain, on 7 Desesber 1951, discharged
of
a total of 28 vehicles, which were procured to replace unserviceable
vehicles, either previously evacuated or to be evacuated.
he new
vehicles includeds
10 each, truck,
5 sash, trusk,
1/4 ten, 0 & RB, 6 and Iterabt
8/4 ton, HOC
i\
1 cach, truck, 8/4 ton, ambulanse -
3 each, truek,
& each, truck,
¥ each, truck,
1 each,
2 eash,
2-1/3
tons, dump
2-1/3 tons, oarge
2+1/2 tons, amph, DUI
truck, 2-1/2 tons, fire, 160-07
trailer, eleotro-magust, road
The bulk of the new vehtoles were placed in storage pending
future needs.
Sone were plased in immediate use, since they repianed
ventales Previouslyevaguated..
>
"air Lire, alletnest fer the period was 46 tons; $6 tons were asedy:
“s tusuffistent carte8and mail was generated.
aanseg
.
.
,
.
“Atleeto
«
wat
Oe
‘
vy
BEST AVAILABLE COPY
REGRADED Uc: ete 7 ca aR
SEC ARMY BY 045.5 PER CRDER
Qc
CU
CC
te
ftw
ew we
Se