AS- - Sv established; H & N construction and support - $26,000,000; Sandia - $17,000,000: EG&G - $14,500,000; for a total of $57,500,000 estimated. “Of this sum, half is teCommitted by 1 Mar. 62 for an operation beginning on that date. Johnston, Midway, Hilo (7) and Christmas Islands were al] considered to represent major construction efforts and several weather islands were includ ed. Cost of a Liberty Ship for LASL is now entered barge cost are." As for local activity and participation of J-6, this has been reduced to almost nothing. 28 Nov. 61, J-10 Report: in two Vela Sierra projects: Here is an extensive summary of J-10 participation As for projects Southern Light, “The all sky Fluorescence detection system continued operation through Nov. 15 and roll up of equipment has been completed. - It could either originate from a low yield event at a distance of at least 10° kilometers or from a shot of unknown + yield at an altitude below the horizon of the Southern Light installation." ¥ | Signal was of the minimum detectable amplitude. This Seren age gem tee A small signal was reported on 25 Oct. under daylight conditions. As for Project Northern Hope, "The objective of this project was A. Fi ming to obtain information from possible Saviet shots exploded at high altitudes above Nova Zemlya by optical means and B. to detect high altitude shots with collimated photo-electric equipment capable of recording X-ray or gamma ray excited upper air fluorescence. Bhangmeters and high frequency EN detectors were also operated part of the time. The adventure was initiated and the station put into operation on very short notice. It was on the air Sept. 21 through Nov. 6. As for the optical system, no optical signals have been recorded and there is no other evidence of the occurrence of Russian explosions within the detection capability of this part of the system. The Bhangmeter part of the system has

Select target paragraph3