|
a
fina
box full of bound
a whole cardboard
is
s,
le
fi
7
FJT
Here in the
Here
e 1960 and 19 61.
ns in the time fram
io
ss
mi
or
Th
y
rl
ea
reports of various
W. Hunter)
s Aireraft Co. (M.
Douglas
om
E
fr
61
v.
No
27
e,
lii ev
ae eae
js a TWX dated, I be
C.
fi V|
rtland. | The TW4 X con tains
RJ in AFSWC at Ki
SW
of
n
ma
ap
<i
Ch
R
h
et
nn
“to Major Ke
.
oO
ed
which were List
ts, all but one of
sho
r
Tho
en
doz
two
the results of about
the documentation having
and probably is. part of
as successes by Douglas
s time.
de booster going on at thi
itu
alt
h
hig
a
of
n
tio
era
to do with the consid
ury, and Schwartz addresses
A 27 November TWX from Betts to Hertford, Bradb
am during weapons testing at
the possibility of doing +he Vela Hotel progr
100 to {O000ki lometers.
CL
it is noted that the DOD has selected the final
ly release funds to implement the
stage vehicle contractor and will short
program.
programs and capabilities
Betts requests that the labs review their
implement the AEC portion,
and advise him concerning their ability to
of the Vela Hotel program.
Further, because
of the past relations with ARPA, efforts should be made to accomodate ARPA's
requirements and meet their schedules and Betts asks that this TWX be
answered by ALQO.
27 Nov. 61, J_12 Report:
Wendall Biggers reports. under the heading of
test planning, on possible measurements of an XW-50 test.
He says "The problem
of neutron flux and spectrum measurements on the XW-50 has been studied from the
Standpoint
of what type of shot »wauk would be best suited for such experiments.
It is our recommendation that a surfact shot, either land or water, would be better
than one in, or above, the atmosphere."
Y