- (BRB pace) Project 5,2 - In-Flight Participation of a B-52 - Ist Lt. F, L. Williams OBJECTIVE The objective of this test was to determine the delivery capability of the B52 aircraft, INSTRUMENTATION 5 om & Instrumentation of the B-52 for (Apache) consisted of 310 ay > oscillograph channels which recorded measurements from strain-gage bridges, accelerometers, roll and pitch gyros, radiometers, control position transducers, thermocouples, pressure transducers, and calorimeters, In addition, 14 cameras recorded photo-recorder instruments (14 channels), wing deflection, cloud coverage, and fireball rise and growth, AIRC°AFT POSITION IN SPACE The following chart shows the airplane's position at zero time and time of shock arrival: Altitude Conditions at Time Zero Condition at Shock Arrival (Abs ft) 34000 34000 Offset (ft) 2600 0 Heading (Trve-deg) Slant Distance (ft) Velocity (fps) TAS Ground 111 38700 740 730 111 63800 757 77 RESULTS ~ “a 7 woe pf 75 oS WN Vw oO : ; |W - 16 =

Select target paragraph3