A. 2. (b)- (9) Location; Mines Read f{eontinved)
Sampling
Times (PST)
& Dates
Volume
cubic
Net counts per minute after sampling terminated
(figures in parentheses are hours and minutes decay)
meters
Combined Beta~gsma
1555, 10/21
Ula?
1152(48)
1555, 10/26
1345, 1/2
63706
2&707(1)3 12725(50)3 13724(69,53);
9873(99,29)3 7733(122,11)
1555, 10/28
5555
10/
(6, OF
3/7,%3
340-44
/92.%4¢
246.10
Alpha
17(48)
313(1)3 65(50)3
50(69,52)3 45(99,27)3
23(122,13)
(10) Location: Site 300, C.Ps
1030, 9/30
1262.1
193(49)
2.64
21(49)
1330, 10/7
3260.1
1860(50)
%-°7
0(50)
1315, 10/25
1124.1
20007(4,0)3 1723(sic)(53)3 10032(72,27)s
1330, 10/7
1315,
315, 1010/27
1040, 12/1
4.37
T197(102,22)3 5812(125,4,)
101,79
$2.20
‘$1.99
320(4,0)3 64(53)3
51(72,25)3 26(102,2h):
21(125,4)
(11) Location: Site 300, Butte Field
0945, 10/6
1215, 10/7
180.1
33(50)
2°
9( 50)