Project
Sumber
‘Project
Organization | Officer
Title
PROGRAM 12 - REACTION HISTORY (B. Watt)
a
12.1
7
12.2
_
UCRL
[History
Telemetered Time Interval
12.3
\
‘History
5. Colgate
J-16, LASL
Watt
g-16, LASL
Watt
“D6
PROGRAM 13 = PHOTOGRAPHY (G. Felt)
13.1
Bali of Fire Photography
EG&G
H. Grier
13.2
Cloud Photography
EG&G
H. Grier
13.3
Bhangmeters, GR Slit Cameras, Etc.
EG&G
Grier
13.4
High-Speed Photography
J-15, LASL
Feit
Time Interval Measurement with
J-15, LASL
Felt
°13.5
Bowen Cameras
PROGRAM 14 = EXTERNAL NEUTRON MEASUREMENTS (C. Cowan)
1h.
J-12, LASL
Threshold Detectors
Biggers
PROGRAM 15 = ALPHA MEASUREMENTS (N.H. Smith)
15.1
Teller and Scintillation Alpha
1S. a
ELECT eam AENWETIC
BLPIR
J-13, LASL
LASL
PROGRAM 16 = GAMMAS AND RESIDUAL CONTAMINATION
6.
(B. Watt)
Gamma,
16-1 FROGR AY ainMceounnoceneny¢or a4, nebine)
17.4
Mi Cre0 BHR OG APN
SANA
PROGRAM 18 = THERMAL RADIATION (H. Hoerlin)
JM Plan on &
18.1
Time Interval Between Reactions
NRL
H. Stewart
18.2
Power va Time
NRL
H. Stewart
18.3
Spectroscopy
NRL
H. Stewart
18.4
Air Transmission and Resolution
NRL
H. Stewart
18.5
149 /
Total Thermal Radiation
NRL
H.
PROC LAA 19. /OAbINE SVeley Laveen Levasoser)
law ine
Svevey
linn, er basen.
aaa" LAB,
Stewart
A Powe Osow
3498