=a
-
A paper on PWR characteristics was considered,
PWR
It was particularly
noted that the estimated operating cost (3000 hr core) ‘was 61.9 mils/iwh
of which 39, 7 mils/kwh was for reactor core fabrication, At least one
member of the Committee felt that the Committee should ‘yepister a protes
on these costs, —
:
:
°
.
at
SEN
Two papers, AEC 493/30 and AEC 3714,/8, on the ‘subject of BRMBa sia.
tea been forwarded to the Committee,
The first contained a letter from
peer Ar. Bradbury to Gen, Fields, dated January 18, 195k, which ‘commented on
_ the need to minimize the
eo
v The second paper contained a letter from
Dr. Froman to Gen. Fields, dated January 21, 195k, regarding an analysis
A“
of the evidence on Eee fromthe 45 nuclear tests to date
DOE AEVEIVES