these arrays perfectly since a tolerance of plus or minus one inch had to
be taken into account. Figure 20 shows the 12-pipe array at Namu traversing
the causeway built for this purpose and terminating on a man-madeisland of
approximately one acre. Figures 21 and 22 show other major scientific construction in varying degrees of completion. Figure 23 shows the manhours
expended for design and drafting.
High density shielding concrete (limonite-steel aggregate) amounting to
Ss
slightly less than 500 cu. yds.
was placed during this Operation. With the
eee terreno ny
eee
ast
ee en
7
tate ee
ee nag
1560.02
eee
ee our
"et
Ek
otTS
tsBesgifete
eeie
“a
as
eat
oer
pa
2%
aes
ees
eet > Tira
ee
ar
Longeden atNPnt
Figure 21.
Stations on Charlie-Baker Reef - Looking Toward the Lagoon.
Stations indicated are listed as follows:
Station 20
Station 1202
Station 1203
-~
-
-
Zero
Shield with Converters
12 Pipe Array
Ho,
Station 1350 Series (1350.01 through 1350.12) - Mirror Towers
Station 135}
Station 1560.02
-
Penthouse on Station 20
37 ft. Steel Tower
Station 1812.01
-
40 ft. Steel Tower
46