Overpressure: 0,34 psi measured at BS 340, left-hand side, Instrumentation Failures: One tail graph channels failed during the By(teva) mission, total instrumentation, 96.2% was operative. fey, et camera and twelve oscillo- -~ 60- Of the

Select target paragraph3