Gust: At shock arrival time, the gust load was 62% of limit wing bending at Station 493.0, the critical station. Bomb bay doors showed visible evidence of minor re-buckling on the same aft sections which were buckled on heft). Peak overpressure measured was 0.59 psi at H+57 seconds. - 58 - QS \ Overpressure:

Select target paragraph3