Project 2.62 ~ Fallout Studies by Oceanography Methods ~ F. D. Jennings (Tewa), Project 2.62 conducted a fallout survey very more. similar to that mede for the WIM (evejo). Three surface vessels, the M/V Horizon, the DE-365, and the DE-534 all remained in the fallout area for five days making measurements and collecting semples. In all, 80 water semples were taken for Project 2.63 and 80 were taken for Project 2.64. Preliminary results show that over 30,000 square miles were contaminated such that had all the fallout occurred at H+l hour, and if it had fellen on an infinite hypothetical plane, the dose rate at a height of 3 feet over the entire erea would have exceeded 40 r/hr at thet time. Several areas within this pattern would have exceeded 3,000 r/hr at H+1 hour. There were 17 deep moor anchor stetions installed for this shot and all 17 were recovered. skiff stetions. Penetration meters had been installed on two of these One failed to fire, the other started and gave a good record of penetration rate. Preliminsry examination indicates that fallout hed ‘ WI. penetrated to the thermocline in less than a helf an hour. EL RS -~15-

Select target paragraph3