Page 7, Line 10
fron bottan
Page 9, lins 10
fran botton
Page 9, line 9
from bottan
Page 9
to
tamination, to make better use af the limited
q@mount of real estate available, and to speed
wp the tests by schedmiling assembly operations
Page 10, line 3
Page 10, lines 2
fron bottom
Page 11, line 10
positions that would insure that DOD Project
602 odtain the required data.