Test.‘Mr eraft Unit,
t designatesmission
. tower officer and “sond. hin‘to“A0C for
final briefing,
oe
CO
Lo
AOC insures pre-positdoning plan. is com
plete’ and adequately disseminateda by Test
iiroraft: Unite
Se
noe
90.
Test Aircraft Unit and Test Support Unit
issue necessary Film Badges, Radiac in-
struments ‘and Dosinctors to all personnel,
ll
Bel
-
0700
AoC insures that Towor porsonnel are ro-
.-
bricfed: on B-Day mission. |;
Test Support Unit insures thet crashre-
moval crews are briefed and propared for
B-Day assignments, .
Test Support Unit insures tint final
arrangononts are made ‘for mossing and
transportation during the mission.
12—
Bel
cee
.
13.
. Bel
14
Bel
.
.
0800"
Test Aircraft Unit submits B-Day aircraft
-
clearences to base operations.
Goneral and specialized bricfings bogin,
=. 0800
1000
ce
,
~
OIC roports stato of Yyoadiness of Teh.
_ . USS ESTES Woathor Centrel-assumos rosponsi-~
bility for Weat her Forecasts, |.
Units report aircraft status to mainten-
ance control, |
Mission flimsies issuod to:‘all:‘adrcrows
by: UnitCormendors.
L
.
é
vee
pat
:
.
“15
16
-
17
i
v
Bel».1030"
Te
we
oe
Bel «3 1300 ©
rrr
Bel
Bel, = 3400
/ Nase cROUP:te
c
>. ARO NNHPR:NO205;
\
Last C-47.‘tight doparts Bikind and C-47
airlift. gporationsero’‘aiscontinued (ro-
"port to JOG).
.
;
"Pre postttontng, of rssicon eiforatt be=
gins
ars
“Test Support Unit, checks crashphone
:ee
operations .