TF Sa
CYS — >
~
Notes: a.
~~
£
Pa
Project 34.4 will havdé installations at RONGELAP, UTIRIK, WOTHO,
ENIWnTOK, KVAJALBIN, and BIKINI. Personnel to man the first four
stations will be provided by the AWS/Rad-Safe organization,
SEVeN CCNF Ltr ser J-3/000.93 dated 8 July 1957, subject:
(JTF
"Operation
of Microbarograph Stations for Operation HARDTACK" refers),
Personnel support for the KWAJALEIN installation wiil be provided
by CO, USNS, KWAJALEIN (JTF SEVEN CONF Ltr ser J-3/000.93 dated
“
8 July 1957, subject: "Operation of Microbarograph Stations for
Operation HARDTACK" and CTG 7.3 CONF Ltr ser 0117 dated 22 July
1957, subject: "Operation of Microbarographic Stations on KVAJA-
-
LIN for Operation HARDTACK" refer)
See para 8 below for Project
34.4 microbarographic training requirements.
tion will be manned by TU-4 personnel,
b.
At BIKINI, installa-
Project personnel who expect to make use of surface transportation
from the EPG to off-atcll sites except WAKE and KwAJALEIN should
be in the £PG to depart from FRED as per the tentative shipping
schedule shown in para 12 below, WAKE and KiJAJALEIN personnel
may travel by MSTS, M4TS or camercial air as appropriate to
arrive on site in time to prepare for shot povticination, ‘The
length ‘of20.42 projec povwle will remain on eft-atoll sites will
depend on shos vzerticipation, Rotation of project personnel,
during the operation, is not plenned.
3.
OFF-ATOLL COiMANDERS:
2
.
a, Request that CJIF SEVEN indicate responsibility for designation of
cormanders of off-atoll sites.
b.
The names and grades of the ranking TG 7.1 project personnel expec-
ted to be present at specified sites are now being obtained and will be forwarded to CJTF SVEN as soon as available.
4.
HOUSING AND MESSING:
a, It is requested that CJTF SEVEN provide or make arrangements for
adequate housing and messing facilities for the project personnel at the various
off-atol sites as tabulated in para 2 above.
b.
In connection with WAKE, reference is made to CJIF SEVEN Ltr ser
J~4,/300.6 dated 15 October 1957 to Mr. J, M. Beardslee,
only Project 6.9 will have an installation at WAKE,
5 persons is realistic,
It appears now that
Therefore, billeting for
5. SITE LOCATION — Authorization to use each of the following sites is
requested and, in addition, authorization is needed to employ native labor on
KUSAIE and CAA labor on WAKE. CJTF SEVtN is requested to make appropriate
arrangements. information currently available follows:
a.
KUCATE
(1)
/ lop
a a!
Liny “oy
“
Project 6.4 requires an area 100! x 100' and Project 6.9
requires an area 175' x 525' on the NE corner of the min
island in the vicinity of Cape HALGAN. The long dimension
must point to WAKE.
ct 6.9 site ner
for the Proje
Ce
2c.
ee
°
rstnr
CLASSIFICATION CAssCELLED
PER DOC REVIEW JAN. 1973
iir. Harold
_
2 /
:
:
Oe.