Reproduced from the holdings of the National Archives
Pacific Southwest Regtvi.
SURVEY REQUIREMENT:
June 4, 1953
Site Elmer
Triangulation:
Secondary:
(Contimued/
aboard an M Boat carrying a DWUK loadec witb the necessary lumber and gear.
In attempting : landing at Site Brave as’
.f the “umber was lost and the
DWUK retrieved with
overat’.on was in progress, a
cifficulty.
While ‘i:
Teletype was receivec advising that $Ote!ion 1) was deleted from the program.
As the “riangulation has a high Friority, i+ was decided that con-
struction and observing would procees
i:
» -n os the weather moderates.
Secondary:
Mike, Love Islet North of King:
No planning has. been done on this group,
be adequate.
it aopears that Wooden Towers will
‘“‘he sneed of construction S:vors them.
It appears that ac-
ceptable results coild be obtained by er tine « single Tower at Site Love
and running a :re-ise vraverse t Mike,
As this cannot be coneduled unti:
L-
sing, end «ne Islet North of King,
Morth, any Home Office comments
Will be apprec atx ,
Baseline
The Baseline woo
cau. taqd sure
mailed tomorra ,
Oboe te Statder
angles dn thio
eee
Topography
Charlie:
arr ty 4
fo 3 a
Bhat iem
we cut
We
Was atberm bet oat
o.
a
a
6 utr
BR
ring made and will be
cach:
om
eoyee'
!
.
oo be taved: = Station
chaining buck,
The
he ALr-Ohoe measurement