Annex G to CTG 7,2 Operation Plan No. 353 (Cont'd)
(4)
Personnel not employed in above missions will form in
motor pool area for additional transportation missions or for employment
as directed by CTG 7.2,
@e
Port Det. 7126 AU
(1)
Organize, equip and assemble the 3rd Rifle Platoon of
the Combat Company (appendix II),
Dispatch this element upon assumption of
alert’ to Combat Company assembly area at Pershing Field to pass to control
of CO, Combat Company upon arrival.
(2) Remainder of Detachment will assemble in unit area for
employment as directed by CTG 7.2.
f., MP Det, 7126 AU
(1)
Continue to-man primary OP on 24 hour basis (OP#1).
(2)
Man Secondary OP's immediately upon sounding of alert.
(3)
(a)
On top of Bldg #1, (OP#2),
(b)
Navy Tower (OP#3),
(c)
Air Base Control Tower (OP#L).
(d)
On top of Butts, May Range (OP#5).
Organize, equip and assemble the Weapons Platoon of the
Combat Company (appendix II),
Dispatch this element upon assumption of alert
to Combat Company assembly area at Pershing Field to pass to-control of CO,
Combat Company upon arrivel,
Ze
he
Combat Company
(1)
Organize, equip and asseuble on Pershing Field.
(2)
Prepare to derloy as directed by CTG 7.2.
Navy Detachnaent
(1)
Beach all lanci..; cratt in vicinity of personnel pier.
(2) Prepare to tr::....rt elements of Combat Company to
other islands of Enivetok Atoll as
+r-cted vy CTG 7.2.
(3) Personnel acc.
in boat pool area for employment
i.
cired for operation of boats will form
erected.
Coast Guard Det
Occupy and defend t... LORAN Transmitter Station,
je
TG 7.1 Augmentation
Assemble in unit area for deployment as directed by CTG 7.2.
k 1G 73 Augnentation BEST AVAILABLE COPY
Assemble in unit arcu 1
1.
wepne wee eevee DY CTG 7229
TG 7.4 Augnentation
Assemble in unit srea for deployment as directed cy CTG 7.2.
X.
TASK COMMON TO ALL UNITS:
non