SFOQ- 430
(3- $0)
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
Saar
COMPLETION REPORT FOR
JOB NO.
AS-BUILT DRAWING NUMBERS AND DATES:
40-365-2
FS-490
4C-616-1
28-132
640 = hf
FS—63
bydwdale
40-615-1
keC-617-1
20-373-1
CONTRACT NO.
For:
LOCATION RUMIT ISLAND = SITE "C*
AT~( 29-1 1-507
g Pee 8
DATE OF THIS REPORT:
23 Mareb 1992
.
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
&
or_20
Bullding No.: 106 = Station 100
hO—b1,5-1
Account
Number
7
"Not for use by Aq
The Complete Construction of Power & Water Distillation Plant
indi2=1
“Property
SHEET NO.
Quantity
Unit
Construction
Contract
Cost
Est'd. Value
Gov. Furnished
Material
Engineering
Cost
Totai
DISTILLATION PLANT
This is « one story reinforced concrete structure with walls and roof slab 17*
thick, floar aleb 6° thick am! concrete masses of various sises for maghinery
and equipment foundations.
There are four hexagon shaped columns measuring 2'-i,"
across the flate supporting the roof slab, and one sessanine deck 15'-2" x i7'8 1/16" with an &* thick reinforced concrete slab. There is a 2'-O" high
parapet 12" thick across the front, and 1)" thick wing-walls extending
diagonally 15'-0" from each corner of the front face of the building. Interior
dimensions of 51'-O" x 2'-O" x 15'-0" high, give an ares of 2,142 square feet
on the sain floor plus 265 square feet on the messanine, end a total content
of 32,130 cubic feet. Three exterior walls and roof are water sealed with 2
layers of 15 pound rag felt, hot mopped, ami structures is earth covered to a
minimus depth of 2'-~O" graded off tao sides and rear at the rate of 1' to 3’.
oomplete with electrical fixtures ani wiring, telephone installation,
three diesel engine driven generators with cubicles end panel boards, pumps, aod
three distillation unite; diesel engine piping, distillation piping, and ventilation equipment and ducts, two air compressors, two air tanks, one chemical
feeder, two fans, one boiler, ome acid tank, ome fuel of] tank, two transformers,
Coste recorded on this sheet do not include equipment installed for generating
electrical power or water distillation. These items are included on sheeta of
their respective system.
$52,257.08
44,9802 71
$1,033.98
$98,271.73
“Proration of
Charges to Units