=
SFO. 43 0
(3. 90)
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SHEET wo._
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
20-906.2
20-302.)
20-949.
JOB NO.
1/19/51
O40 = le
CONTRACT NO.
For:
1/19/51
1/19/51
5
or_2
��Not for use by A-E
AT-( 29-1) ~507
LOCATION
Page 5
DATE OF THIS REPORT:
19 January 1951
RUNIT ISLAND — SITE *c*
The Complete Construction of Open Air Motion Picture Theatre
Bullding Ne.: 103
ESTIMATE
“Property
Account
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
1
Each
Direct
Construction
Contract
Est'd. Value
Gov.Furn! shed
Engineering
Cost
Total
OPM! Aig MOTION PICTURE THEATRE
Seating capacity - 202 seats, 14 wood benches with back rests. Screen structure
sise 21'-O" wide x 17'-0" high; transite screen 16'-0" x 12'-0", anchored to
reinforeed concrete piers and footings; wood stairway and platform at one side
of screens; canopy. Screen S?'-6" fron projection booth. Electrical and speaker
servies.
Projection Booth - ome story wood and aluminum construction; rectangular
shape; sise 6'-0" x 11'-6" x 8-0" highs set on a kh" concrete slab; 2" x L*
With corrugsted aluminum roofing and siding; electrical services; floor
area 0.D. 92 square feet; oubic content I.D. 616 cubic feet.
Installed equipment includes: Two scund projectors.
Flood lighte.
Indirect
06,655.44
3,056.90
>
$116.12
99 , 858 46
*Prorat| on
?
Charges to oa Unite