COMPLETION REPORT .FOR
AS-BUILT DRAWING NUMBERS ANO DATES:
20-382-1
20-926-1
JOB NO.
6L0 = hg
1/15/51
1/15/51
CONTRACT NO.
For:
sweet no
Cuinteie’.T
AT=( 29-1 1-507
. Not
LOCATION RUMIT ISLAND = SITE "C*
ar)
for use by A-E Page
2
DATE OF THIS REPORT:
The Complete Construction of Refreshment Tent
Bullding Now:
2
15 Jem
195
52
ESTIMATE
” Propert
hceount™
DESCRIPTION OF PROPERTY UNITS
Number
Quantity]
unit
Construction
Cont ract
Cost
Est'd. Value
Gov. Furnished
Material
Enginearing
. Pp
Total
REFRESHMENT TENT
ChargesfoUnite
/
Shelter - canvas and wood construction; rectangular shape; sise 0.D. 20'-6" x yb! ~08
x 10'-O* high) earth floor; 4" x 6" posts on concrete piers; 2" x 4h" rafters; 2°
x 6° ribbons, 1" x \" braces, 2" x 4" ridges roof covered with canvas; floor
aree 913 square feet. Tent - canvas and wood construction; sise 0.D. 1h'=2" x
.
~
~~
Ly'=-4" x 11'-6"3 set on 4b" concrete slab; canvas fly separated from tent roof
by spacer block and fly ridge; wood frame walis 3'-0" above slab covered with
plastic screen) door frame, ridge supporte ani ridge above wall frase; electrical
service; counter; floor area 0.D. 203 square feet.
Reefer - " thick concrete
slab sise 6'-0" x 21'-0" connected to tent floor by 4" thick conorete slab
size 5'-O" x '-O"; floor area 0.D. 146 square feet.
Installed equipment includes:
and one cash register.
One refrigerator, one safe, one ice flake nachine,
i
Each
Direct
Indirect
$12,042.92
3,486.76
_
S§reteET
$224.10
$15,753.79
“The doen,
he Natvonal
ranemineion
In any man
prohibited
penalties under apptid