COMPLETION REPORT FOR
2b-516
28-5328
JOB NO.
640 - lw
3/19/52
Feropecty|
Property
Account
Number
pot
CONTRACT NO, AT-(29-11-507_
For:
3/19/51
3/19/51
"Not for use by A-E
LOCATION PARRY ISLAND - SITE '*B"
,
The Complete Construction of Underground Shelter & Guard Towers
DATE OF THIS REP@RT:
19 March 1951
©
*
334, 335, and 33%
Building No.;
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
Construction
Cont ract
Cost
Est'a. Value|
Gov, Furnished
Material
Engineering
Cost
Total
UNDEHGROUND SHELTER - Building#334
Reinforced concrete vault construction with 10" thick roof and walls and 12" thick
deck set entirely below grade.
Inside dimensions 10'-0" x 10'-0" x 7'~+) 1/8" high
furnishing 100 square feet floor area and 712.5 cubic feet content. Enclosed
accesa ramp has 5" thick concrete deck, 2" x 10" frame covered inside with 1/2"
plywood, and outside with 2" x 6" T & G diagonal sheathing covered with 2 ply
15# felt mopped on. Equipped with electrical fixtures and underground connections
to Buildings #335 and #336, all inside 100'-O" x 4'-O" chain link fance and
barved wire enclosure.
GUARD TOWERS - Buildings #335 and #336
Wood frame, shed roof construction with 90# mineral surface composition roofing
and plate glass windows on four sides. Interior dimensions 6'-O" x 6'-0" x 7'-6".
Metal greting deck 6'-O" above grade and accessible by wood ladder extends three
feet beyond structure forming a balustraded balcony on all four sides. Structure
is supported by four 6" x 6" posts, cross-braced and anchored to reinforced
concrete piers. Electrical facilities are provided.
1
Area
Direct
Indirect
$16,617.42
13,17742
$102.51
$29,897.34
*Proration of
Charges to Units