ATOMIC ERERGY COMMISSION
SANTA FE OPERATIONS OFFICE
»
JOB NO.
-BUILT ORAWING NUMBERS
2B-146
12/23/50
23-150
12/23/50
28-324
12/23/50
2B-428-1
§=640 - ld
¢
CONTRACT NO.
or :
OF
68
Page 112
DATE OF THIS REPR@RT:
23 December 1950
3}
Motor
and DUKW Repair Shop
.
322
ESTIMATE
Property
—-
48
"Not for use by A-E
LOCATION PARRY ISLAND - SITE "Bp"
oT he Complete C Construction of f
Bullding No.:
12/23/50
recount
_AT-129-1)-507
;
SHEET NO.
Siani+
COMPLETION REPORT FOR
1
Quantity
DESCRIPTION OF PROPERTY UNITS
i
Unit
Construction
Cc ont ract
Est'd. Value
. Furniished
Goween
Engineering
*Proration
Cost
fo ee
Total
_————
MOTOR AND DUKW REPAIR SHOP
One story aluminum constructions rectangular shape; size I.D. 24'~O" x 60'-8 1/2"
x 12'-0"; set on 5" thick concrete slab; double roof, separated by 2" x 4" red-
woods vented window panels; aluminum partitiona; benches; sliding doors; with
lighting and power services; telephone installation; plumbing; floor area 0.D.
1,557 square feet; cubic content I.D. 14,570 cubic feet.
Two concrete slabs, 5"
thick, 15'-0" x 17'-O" and 21'-O" x 32'~O", total 927 square feet.
Installed equipment includes: Two floor jacks, two tool sets, one compressor,
amd one water cooler with drinking fountain.
.
1
Each
Direct
Indirect
$11,816.88
4,097.28
$254.8),
$16,169.00
of
|
Charges on to of units