(3. 90)
COMPLETION REPORT FOR
#08 NO.
AS-BUILT DRAWING NUMBERS AND DATES:
oi
For:
Tye
28-339 «=11/13/50
28-942 11/13/50
—
"Property
CONTRACT NG.
640 - ld
LOCATION
AT=-( 29-1 1-507
"Not for use by A-E
DATE OF THIS REPORT:
PARRY ISLAND - SITE "B®
13 November 1950
The Complete Construction of Construction Materials Warehouse
Bullding No,: 308
ESTIMATE
—
DESCRIPTION OF PROPERTY UNITS
eoune
SHERT wo. 37 or 66
” Page 99
ea!
Quantity
unit
1
Sach
—
Construction
Contract
Cost
Est'a, Value -
Gov.Material
Furnished;
,
;
“Td! Cost
neering
Total
CONSTRUCTION MATERIALS WAREHOUSE
This is a one story, twin (parallel) gable s
aluminuzs building, size I.D. 50'-~O" x 100'-8
@ roofed, prefabricated
1/2" x 10'-O" mean height, erected
on a S1'=2" x 101'-10 1/2" concrete slab 5" thick; complete with electrical
wiring and fixtures, telephone service, and four saliding doors closing two wall
openings 6'-)] 1/2" wide in each end. The building has a cubic content of
49,950
cubic feet and a total floor area of 5,210 square feet.
Direct
Indirect
SREET
$23,555.90
6,955.66
$808.16
$31,319.12
“Proratl
t
orationto o Units
Charges