AS-BUILT ORAWING NUMBERS AND DATES:
JOB NO.
2B-S161 2/2h/51
23-5326
2B-SiiG
640 = ld
2/24/51
2/24/51
OPLETION REPORT FOR
e
“CONTRACT NO.
For;
_AT-( 29-1 )-507
eee,
“Not for use by ade Page 10,
LOCATION PARRY ISLAND - SITE "B*
OATE OF THIS REPORT:
sutet wo._32 or68
2h February 1952
The Complete Construction of Showers and Latrine, 100 Man Capacity
Bultding No.: 233, 234, 235, ami 236
ESTIMATE
"Property
A
Number
o
SCRIPTION OF PROPERTY UNITS
Quantity
Unit
4
Each
Construction
Contract
Cost
Est'd. Value
Gov.
Furnished
Material
Engineering
Total
$139.55
$17,678.11
Cost
SHOWERS AND LATRINE - 100 Man Capacity
A one story wood frase gable roof and sides corrugated aluminum covered, on 6"
concrete finished floor slab with " x 4" curbing for all walle md partitions,
sise 0.D. 25'-0" x 36'-0" x 10'=0", complete with electric wiring and fixtures,
freeh and salt water plumbing, total floor area 900 square feet.
The equipment includes:
Six toileta, six toilet enclosures, six urinals, 16
lavatories, 10 shower heads, sight mirrors, three duckboards, and, outeide
mounted on a cencrete pad, ome water cooler with a drinking fountain.
1 Unit
TOTAL - 4 Units
Direct
Indirect
$10, 795-52
6, 7h3.0k
$70, T12.b6
.
Proration of
.
Charges to Units