COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
2B-391
3B-2118-4
varie
2B~Su11
1/19/51
JOB NO. 640 -ld
CONTRACT NO, AT-{29-1)-507_
For:
SHEET wo.30 or68
Ouest
.
LOCATION PARRY ISLAND - SITE “B*
DATE OF THIS REPORT:
ly January 1951
The Complete Construction of Laboratory Bailding
Not for use by A~E
Page 84
Bullding Now: 231
ESTIMATE
*Property
Account
SCRIPTION
DESCRIPTI
OF PRO PERTY
UNITS
u
y
Quantit
unit
Construction
cerec
Contract
Est'd. Value
Gov.uaterra
Furntshed|
Enal
Cost
Engineering
Total
$311.49
$33,507.60
LABORATORY BUILDING
Qne story alumimm construction; rectangular shape; sise I1.D. 24'-0" x 26'-6 1/2"
x 12'-0"; set on S" thick reinforced concrete slab; double roof, separated by
2° x L* redwoods; vented window panels; aluminum partitions; with electrical
services; plumbing; dehumidification equipment; floor area 0.D. 752 square fest;
cubis content 1.D. 6,890 cubic feet. Cabinet, shelving and benches. Hoist rail
and frame over 6" thick reinforced concrete slab, 15'-S" x 12'-6" — 193 square
feet.
Installed equipment includes: One dehumidification unit, two laboratory tables,
one hood assembly, one exhast fan, and om still.
1
Each
Direct
Indirect
$25,510.33
7,655.78
*p
Charges
porationto ofUnits