13-50} JOB NO. 640 - 2p 640 = 2q 7th Engineer Brigade Drawings Shts. 1 thru 16 = 1/17/51 98-601 4/21/51 9a-525 3/19/51 24-637 "Property - COMPLETION REPORT FOR AS-BUILT DRAWING NUMBERS AND DATES: 2a-¥d2 2h 7 ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE ‘ SFO-43 0 3/19/51 3/19/51 309/51 CONTRACT NO, For: for use by A-E DATE GF THIS REPORT: 21 april 1951 121, 12h, ESTIMATE Quantity DESCRIPTION OF PROPERTY UNITS Account Numoer "Not The Complete Construction of Freah and Salt Water Systems, Elevated Water To r, Salt Water Pump Station, and Acid Tank Bldg. Bullding No.: FS-173 4/19/51 LOCATION ENIWETOK ISLAND - SITE "a" AT-( 29-1 }-507 SHEET NO. _3Q__oF }y Unit Construction Contract Cost Est'd. Value Gov. Furnished Material! ~T Enginee ring Cost Total *Proration of Charges to Units FRESH WATER SYSTEM Consists mainly of 3", )" and 6" transite pressure pipe, 2'-6" usferground, valves, fittings and services to the extent of 22,565 lineal feet of mains, 1 fire hydrant and 67 service connections. System Direct Indirect $33,631.60 8 O09 .27 $2,535+h5 $l, 216.32 Direct Indirect - $33,139.64 79931653 $2,573.10 $43, 6h4.27 Lot Direct Indirect $197,901.00 25, 503-9k Direct Indirect $261, 672624 1 ,4Sh.7h SALT WATER SYSTEM Consists mainly of 4" and 6" transite presaure pipe, 2'-6" underground, valves, fittings and services to the extent of 22,900 lineal feet of mains, 22 fire hydrants and 66 service connections, Syston ELEVATED WATER TOWER - Bldg. #121 This structure consists of one salt water storage tank (1,000 barrel capacity), ons fresh water storage tank (500 barrel capacity), both same dianeter, mounted on a structural steel and wood platform, size 27'-0" x 52'~0" with 3'-6" handrail all around, elevated 50 feet above grade by ten 12" x 12" spliced wood columns, vertically and horisontally criss cross braced, four benta high by four bents wide, with 3/" diemeter tie rods, concrete foundation piers with anchor bolts supporting the ten columns, fixed wood ladders reach from grade to intermediate and top platforms. The structure, including tanks with steel ladders, is painted and complete with pipe, fittings and aircraft warning light. Cost of thie item is included in the Fresh and Salt Water Systens. WATER DISTILLATION EQUIPMENT kquipment includes: ight 600 G.P.H. distillation units, piping, pumps, tanks, and chemical feeder, all located in Building #56, and eight distillation units in Building #S6a. TOTAL - Systems & Equipment $223, LO04.9h $5,108.55 $311,265.53 SALT WATER PUMP STATION - Bldg. #12) A one story, double roof, prefabricated aluminum building, erected on a 5" thick concrete floor slab with s drain trench and concrete masses for equipment founda tions and pipe supports, size 0.0. 25'~2" x 33'=10 1/2", total 853 square feet, Continued on Next Page Stati APUpV ad toon affecting: Doevteed Siare Lite

Select target paragraph3