ATOMIC ENERGY COMMISS1ON
$ FO.43
(3.50)
AS-HUILE
COMPLETION REPORT FOR
JOB NO. 640 = 2 1=(1)
DRAWING NUMBERS AND DATES:
640 - 2 1=(2)
640 - 24-2 For:
CONTRACT
NQ.
T
The Complete Construction of
DESCRIPTION OF PROPERTY UNITS
ENIWETOK ISLAND - SITE "A"
"Not
for
DATE
OF
use by
Quantity
19 April 1951_
FSTIMATE
Unit
Construction
Est'd.
Contract
Value
Gov. Furnished]
Cost
Material
Etyineering
Cast
Total
Consiate mainly of 3" and 4" pipe, valves and fittings and extend from the
equipment included in the report of Building No. 9h, which is within the
stencil identified.
1
Each
1
Each
i
Each
1
Each
Other Facilities not within the Enclosed Area are:
TIMBER GREASE RACK - Bldg. #190 - FS=622 - 4/14/51
This is an elevated wood structure mith concrete ramp, size 0.9. 16'-7" wide
x Lk'-2" long x 5'-8" high, erected on a 12" thick concrete slab with 4” high
concrete base curbs. Complete with stairs and deck grating.
TRUCK LOADING RACK ~ Bldg. #181 - 11a-5i13 - 1/11/51
Five truck loading stands complete with satandpipes, loading arms and piping;
fencing.
TIMBER GHEASE RACK ~- Bldg. #183 - 18H-626-3 - h/19/52
Orease rack, for servicing sobile equij«sat, wood structure, size 2'-9 3/4" long
x 10'-0" wide, plus bracing, elevated 5'-5" above grade, with two tread raaps
20'-6" long leading up fram concrete anchor pads.
TOTAL
Direct
Indirect
$88,059.02
1,989 266
$91,183.22
$4,133.95
P.O.L. PUMP HOUSE = Bldg.#9 ~ 24-964 thru lla-67 - 1/11/51
One story, double roofed, prefabricated alusinun building; rectangular shape;
size I.D. 24'+0" x 48'8 1/2" x 10'-O" mean height; set on a 5" thick concrete
slab; vented window panels; electrical wire and fixtures; piping; 8 pumps; 9
dehydrators; 3 air eliminators; 6 line meters; and miscellaneous contro] valves,
strainers, etces floor area O.D. 1,258 square feet; cubic content 11,690 cubic
Leet.
Contimued on Next Page
a
1
-
gt
P
~
A-t
THIS REPORT:
PIPiNG SYSTEM FUR FUEL ULL AND GASOLINE — 114-5412 thru 11A-Sk09 - 4/1L/51
encloeed area, to the various storage tanks, service racks and pumps, and to
the refueling station in the lagoon. Suitable reinforced concrete piers (mastic
covered) and pipe supports are provided. All piping is aluainua painted and
of a
Su, 95, 95A, 96, 96A, 180, 181, and 183
Number
|
SHEET NO 27
P.0.L. Facilities
SnEan
Continued from Previous Page
Account
LOCATION
AT-4 29—1)-507
Building Na.:
"Property
inbeainint
#ORNTA FE OPERATIONS OFFICE
a
Bach
Direct
Indirect
$35,230.53
2p
5i.
OW
etew
.
-
$201.68
:
Proration of
Charges to Units