ATOMIC ENERGY COMMISS1ON $ FO.43 (3.50) AS-HUILE COMPLETION REPORT FOR JOB NO. 640 = 2 1=(1) DRAWING NUMBERS AND DATES: 640 - 2 1=(2) 640 - 24-2 For: CONTRACT NQ. T The Complete Construction of DESCRIPTION OF PROPERTY UNITS ENIWETOK ISLAND - SITE "A" "Not for DATE OF use by Quantity 19 April 1951_ FSTIMATE Unit Construction Est'd. Contract Value Gov. Furnished] Cost Material Etyineering Cast Total Consiate mainly of 3" and 4" pipe, valves and fittings and extend from the equipment included in the report of Building No. 9h, which is within the stencil identified. 1 Each 1 Each i Each 1 Each Other Facilities not within the Enclosed Area are: TIMBER GREASE RACK - Bldg. #190 - FS=622 - 4/14/51 This is an elevated wood structure mith concrete ramp, size 0.9. 16'-7" wide x Lk'-2" long x 5'-8" high, erected on a 12" thick concrete slab with 4” high concrete base curbs. Complete with stairs and deck grating. TRUCK LOADING RACK ~ Bldg. #181 - 11a-5i13 - 1/11/51 Five truck loading stands complete with satandpipes, loading arms and piping; fencing. TIMBER GHEASE RACK ~- Bldg. #183 - 18H-626-3 - h/19/52 Orease rack, for servicing sobile equij«sat, wood structure, size 2'-9 3/4" long x 10'-0" wide, plus bracing, elevated 5'-5" above grade, with two tread raaps 20'-6" long leading up fram concrete anchor pads. TOTAL Direct Indirect $88,059.02 1,989 266 $91,183.22 $4,133.95 P.O.L. PUMP HOUSE = Bldg.#9 ~ 24-964 thru lla-67 - 1/11/51 One story, double roofed, prefabricated alusinun building; rectangular shape; size I.D. 24'+0" x 48'8 1/2" x 10'-O" mean height; set on a 5" thick concrete slab; vented window panels; electrical wire and fixtures; piping; 8 pumps; 9 dehydrators; 3 air eliminators; 6 line meters; and miscellaneous contro] valves, strainers, etces floor area O.D. 1,258 square feet; cubic content 11,690 cubic Leet. Contimued on Next Page a 1 - gt P ~ A-t THIS REPORT: PIPiNG SYSTEM FUR FUEL ULL AND GASOLINE — 114-5412 thru 11A-Sk09 - 4/1L/51 encloeed area, to the various storage tanks, service racks and pumps, and to the refueling station in the lagoon. Suitable reinforced concrete piers (mastic covered) and pipe supports are provided. All piping is aluainua painted and of a Su, 95, 95A, 96, 96A, 180, 181, and 183 Number | SHEET NO 27 P.0.L. Facilities SnEan Continued from Previous Page Account LOCATION AT-4 29—1)-507 Building Na.: "Property inbeainint #ORNTA FE OPERATIONS OFFICE a Bach Direct Indirect $35,230.53 2p 5i. OW etew . - $201.68 : Proration of Charges to Units

Select target paragraph3