, ATOMIC ENERGY COMMISSION dieretieiy: SANTA FE OPERATIONS OFFICE Fo. 430 (3.501 sweet NO. 22 or 4 COMPLETION REPORT FOR AS-BUILT DRAWING NUMBERS AND DATES: -6 - aaah 26-034 Za-by8 Yaa 1/11/51 / 1/1/51 eet 2a-5H9 *Property Account JOB NO. 640 = 23 CONTRACT NO, —AT-129-11-507_ For, Uae 1/11/51 ; The Complete Construction of Building No.: 89 LOCATION ENIWETOK ISLAND - SITE "a" . 1 January 19 Base Operations Building and Control Tower ESTIMATE DESCRIPTION OF PROPERTY UNITS Number "Not for use by A-E DATE OF THIS REPORT: Quantity Unit koe Construction Contract Cost a Est'd. Value Gov. Furnished Material Ena . noe “OS Total 3 size I.D. 24'-0" x 961-8 1/2" x 10'=0" mean neight with wing 2)'-O" x 76'-8-1/2" x 10'-0" mean height; anchor bolted to a 5" thick concrete slab; vented window panels; aluminum partitions; wood counter; electrical wiring and fixtures; plusbing; floor area O.D. 4,445 square feet; cubic content 42,100 cubic feet. ment includes: Two water coolers with drinking fountains. Installed equip- i Each Direct indirect $37,256.79 1,455.52 $1,243.76 $39,956.07 CONTROL TOWER Three story wood and aluminum construction; rectangular shape; size 0.D. 23'-7 1/2" x 23'-7 1/2" x 27'- 5/8" high; anchor bolted to a 5" thick concrete pad; aluminus flat sheet roof on 2" x 10" joists with 1" T & G diagonally placed, corrugated aluminum siding on wood framing up to control room deck; control room walla of 1/4" thick heat tempered glass and flat aluminum sheet on wood framing; aluminum sash, aluminum louvered door, ventilation hoods; floor of 2" T & G flooring with 3/b" plywood over; wood stairway and handrail; wood handrail and deck on catwalk; electrical wiring and fixtures; floor area 0.D. 87) square feet; cubic content Roof exhauster in control roame 1 Each Direct $7,325.63 CAL Uap “si 5,2h6 cubic feet. mene . Charges toa —4- -- ek BAS: OPERATIONS BUILDING - Bldg. #69 Une story, double roof, prefabricated aluminum construction; "L* sh *p . te mits

Select target paragraph3