ATOMIC
Sh
(3
SANTA
au
501
ENERGY
FE
COMMISSION
OPERATIONS
qe
OFFICE
COMPLETION REPORT FOR
sah!
3E-5670
3E-081
4/2/51
eas
%G-5651,6
lov ho)
Blayney
3/9/51
3-080
3/9/51
G-5653
3/9/51
3G-5437
729 = 26
typhi
3/9/51
ie
building MO..
LooaAce
tes
tT, L.
ot
phEET
"Nor
. ENIWETOR ATOLL
Se
Nw
te
de
rotted]
the
fet
Beate ure de
2A pril 1951
Pit
Station No, 143
:
be
t
HOR ROPE RI Y
UNIT
Koearhity
tha.
.abae
hoyrtiy
bee.
tied
UCRL AND MRLK REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
T,L, PIT,STATION NO, 143 ON SITE “E®*
A reinforoed concrete connection pit, size I,D, 10'-0" x 16'-O" x5'-3" deep,
8" floor slab and walls, with ramp to Station 141 and trench to base of
tower, 8
pump, 4 12" thick reinforced concrete retaining wal) 5'-3" high
xX 25'-9 1/4" long, with reinforced concrete foundation, ip attched to pit, A
4" concrete side walk, 3'-O" wide x 31'-0O" long beteeen retaining wall and
Staticn Lila and b complete with electric wiring and fixtures and piping,
Each
Direct
Indirect
$4,910, 80
4,146,10
$190,21
$9,253,11
241,53
11, 567,82
T,L. PIT, STATION NO, 143 ON SITE "D = VF"
a4 reinforced concrete connection pit, size 1,D, 11'-0" x 161-9" x 51-3" depth
8* floor slab with 8" walla, with ramp to Station ljla, tunnel opening to tower
base, sump pump and plumbing, and electric wiring and fixtures,
Fach
Direct
Indirect
5, 528,81
5,797 48
fat
Poas ye
Waters al
yor
t.
vt
Hirt