COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS ANDO DATES:
3W-5173
4/2/51
30-5431
4/2/51
3¥-041
JOB NO, 129 = 2%
CONTRACT NO,
4/2/51
2
For:
AT~(29-1)-507
as
LOCATION
“Not for use by A-£
DATE OF THIS REPORT:
EMNIWETOK ATOLL
2 april 1951
The Complete Construction of Building
Building No.:
Station 135
ESTIMATE
a
“Property
Account
Number
=
_
.
—~
.
Quantity
DESCRIPTION OF PROPERTY UNITS
:
Unit
Construction
Contract
Cost
Fet'd.
Gov.
Value
;
Furnished
Material
Engineering
Cost
os
*“Proration of
Charges to Units
Total
3
UCRL AND MALE REQUIRED CONSTRUCTION AND LOCATION GF THE FOLLOGZNG STATIONS:
BUILDING, STATION 135 OW SITE "D - ¥*
A one etery, shed roof, wood and corrugated alumimm building, sise 0.D, 7'~7 1/4"
x 7'=1 1/4" x 7'=6" high (mean), set on sonerete tower cap, Complete with ejectrioal wiring and fixtures and air sonditioning,
1
Reeh
Direct
WOOD HUT, StaTION 135 OM SITE “°E®*
A one story wood frame lean-to, attached to Station 13la, corrugated roof and
sides, erected on « reinforeed 5° concrete slab, size 7'-7 1/4" x 12'-1 1/4",
structure aise 0,0, 8'-7 1/4" x 7'=7 1/49 x 7'-6" high, inside finished for de-
homidification, complete with electric wiring and fixtures,
$1,874,33
1,839.66
$84.53
$3,798, 52
43,95
2,338, 33
|
1
Each
Direct
Indirect
1,042,43
1,251,95
CA UTIOD
ThisGe
the Na@ional Defense.
trangmipatan or the di
in apy Manner to an
prohubijed and may
penalties under appt
inf
re
tho
tin
Fy
mn affecting
Staves iw
Qo
units