ATOMIC ENERGY COMM!SS!0N SANTA FE OPERATIONS OFFICE SFQ.43a (3. 50} AS-BUILT DRAWING Winn AND DATES: 2/51 ° 30-078 3-54.26 36-5628, 3 — eT COMPLETION REPORT FOR S08 NO. 729 ~ 26 CONTRACT NO. 4/2/51 For: 4/2/52 4/2/51 : pn aha nn aen LOCATION ENIWETOK ATOLL DATE OF DESCRIPTION OF PROPERTY UNITS + Quantity 7 THIS REPORT: 2 April 1951 Work ant Storage Tent, Photo Trailer Buiiding No.: Station Nos, 132a thru g — Account "Not for use by A-F AT-i 29-1 )-507_ The Complete Construction of Resording Station, Power Supply, T,L, Termination ® “Property SHEET No,83 op _ totiMatre cee ep ane ee Unit Construction Contract Cost 4-—— — fst 'd. Value Gow. Furnished Material Engineering Cost Total 4 UGRL AND NALE REQUIRED COMSTROCTION AND LOCATION OF THE FOLLOWING STATICHS: RECORDING STATION 1320 AND b OM SITE "D - ¥* & reinforced concrete structure, sise 0.D, 30'-2* x 361-8" x 16'-O0*high, with 36° thiek fleor and roof reinforced with reinforcing and styvctural steel, exterior walle 2'-4" thiok reinforsed concrete, interior dividing wall 1'-6" thick reinforced concrete, 4 reinforced concrete retaining wall 12° thick x 301-2" long sete on face wall, arth fill at rear of structure and over top to depth of 5'-0", Bach oonpartuen% complete #ith two axplosion proof doors, slesves walle, ineetts for bolts, electrical wiring and fixtures and air conditioning, Installed equipment ineludes two air conditioning units, Rach POWER SUPPLY STATION L3te OM SITE "D ~ ¥* Two sloping reinforced conctete wing walls attached 1'~2" thiek z 14'-0" long x 12'-4" pean height, set 4" conorste fleor slab, with temporary wood shelter fill, Complete with electrical wiring and fixtures to Stations No, 132a anit 132b, on eoncrete foundations, and to be removed before final earth and drains, Each T,L, TERMINATION STATION 1324 ON SITE "D ~ Vv" Temporary wood shelter sise 0.D, 12'-0" x 36#-4 3/8" x 10!-4", plywood roof covered sith mopped on lif roofing felt, earth floor, Complete with electrical wiring and fixtures, Raoh WORK AND STORAGE TENT STATION 1320 AND f ON SITE "D - ¥* 8 man tent with wood frame on 4" concrete slab, Eaok PHOTO TRAILER STATICN HO, 132g ON SITE "D - ¥* Supplied by user, Total Cost Station Mo, 132 a, b, 0, a, 9, f and g the Waticaa We UPS Nein ot Direct Indireat| $97, 148,93 53,353,67 ae, $4,928.69 *Proration of Charges to Units $155,431.29

Select target paragraph3