ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 43a
(3. 504
AS-GUECT GRAWIN >» NUMBERS AND
¥=5651,6
30-5653 5
4/2/51
4/2/51
30-5654,5
4/2/51
36-5656 ,5
3-041
CATES:
Number
Ria
ENIWETOK aTOLL
- ee
NO
89 or
fur use by Aqt
GALL
OF
TRIS REPO:
2 April 1951
ss
I;
a
_—
Quantity
PROPERTY UNITS
———
beth al
tative
nev, boatps he
Malerial
wnat
cope
fT
re
|
| UCRL aND WRLK REQUIRED COMSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
|
Lun Ad bats
Blook House at Cab Base
4/2 51
DESCRIPTION OF
—
Al-igy-is-bu?
‘urytruction of
SHEET
“Not
_
{AQ fee ne ty
vit
_
_
lotal
BLOCK HOUSE, STATION NO, 131 OM SITE "D -¥*
A reinforced lisonite concrete structure, sise 0,D, 12'-6" x 15'=8" x 10'~11" high,
erected on a 5'-O0" thick concrete foundation of reinforced coral concrete set on
steel piling, 4 pieces 12° dia, x &'-0" long steel pipe sleeves installed in flocr,
|
& pieces tubing 14% die, x 4'-9" long extended from chamber to 2" above roof,
:
*
Biailding No.: Station Ne, 131
|
---
DONTKAC T Nu.
Ihe
1é
Jo dete)
hare
Ghamber clogure will be acoomplished by use of limonite concrete cubes,
The build-
ing ie complete with air conditioning, electrical wiring, fixtures and ducts for
instrumentation connections,
Chamber sise I,D, 5'-2" x 8'-0"8 x 6'-4* high,
limonite slab 30" thick extends from entrance to Station No, 143,
A
Each
Direct
$40,536,76
Indirect 15,856.78
Grouting Progrem Lamp Sum
Total Station 131
Direct
Indirect
Direct
Indirect
$2,206.08
|$58,599,62
10,448.74
13, 398, 26
-0-
23,847 ,00
50,985.50
29,255.04
2,206.08
82,446.62
-
Account
JOB NU. 729 - 2%
30-5437 4/2/51
“Prope rly
}_
5 el,
COMPLETION REPORT FOR
“hr ration ot
hargjes te Unite