ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
srt. 47a
13.50)
Sqn
ayaa Gee AWE
ONUIMEE BN
3T-Gi .6 - vey 1
5B-038
-
for:
3/5/51
LOCATION
CONTRACT NO, AT=4 29-14 1-507_
KJ hu, F8G = 22
.
;
The 'tomplete Construction of
Butlding No.:
. Property
Aveo ynt
Db‘,
+
REPTION OF
—-
rr:
ee
Not
for use by A-E
Maro
Thermal Expo gure Building
‘
Stations 77, 78, 79
is
7
.
.
Quantity
PROPERTY Units
sneer wo 74. or
mS OF yeiga
MIWETOK aTOLL
.
ee
a eH
~
.
nit
-
-
ESTItMATE
~—
7
7
Construction
fonts t
—t..
Cs
a
“TT
a —
Est'd.
Value
rn
Cows eo tshed
.
naa
.
.
Engineerin
ae
a
Total
e
|. — ——+ So —-—4 a
T.B.- REQUIRED CONSTRUCTION AM) LOCATION OF THE FOLLOWING STATIONS:
THERMAL EXPOSURE BUILDING, STATION 77, SITE “T*
Wood structure on concrete slab. 0.D. 6'-2 1/2" x 22'-0 1/2" x 7'-3 1/8".
O.D. slab area 138 square feet, I.D. volume 396 cubic feet. Plywood sheathing
inside finish; blanket ingulation between stude and joists, sides md osiling.
2" x 8" redwood sheathing all sides, with outside aluminum covering top and
sides, Floor 2'+3" below grade, slope to entrance, oomplete with electric
wiring and fixtures.
THERMAL EXPOSURE BUILDING, STATION 76, SITE "1"
1
each
Direet
Indirect;
.
$16,270.07
$12,172.57
$115.51
$29,166.15
Wood structure on conorete sleb. 0.D. 6-2 1/2" x 22'-0 1/2" x 7'-3 1/8".
O.D. alab area 138 aquare feet. i.D. volume 396 aublo feet. Plywood sheathing
ingide finish; blanket insulation between studs od joiats, sides ani osiling.
2" x 6" redwood sheathing all sides, with outeide aluminum covering top and
sides. Placed on a raft oonsi sting of pontoons and of] drume strapped te a 2" x
8" timber deck, sise 10'-O" wide x 21'-5 1/1" long.
1
THERMAL EXPOSURE BUILDING, STATION 79, SITE “C*
each
‘
Indirect
1h .86
180.19
10,938 .86
2000 40
019.67
138.09
9,158.16
2,315.12
2,334.47
56.95
4,708.54
Direot
323.81
Wood structure on oonurete slab. 0.D. 6'-2 1/2" x 22'-0 1/2" x 7'=3 1/6".
O.D. slab area 138 aquare feet, 1.D, wolume 396 oublo feet. Plywod sheathing
inside finish; blaket insulation between studs and joiste, sides and ceiling.
2" x 8" redwood sheathing al] sides, with cutside aluminum covering top and
sides, Floor 2'-3" below grade, slope to entrance, complete with slectric
wiring and fixtures.
1
THERMAI. £XPOSURE BUILDING, STATION 79, SITE *P*
Wood etrusture on concrete slab,
0.D, 6'-2 1/2" z 221-0 1/2" x 7'-3 1/8",
each
Direct
Indire ot
0.D,
aleb area 138 eq<uare feet. I.D. volume 356 oubio feet, Plywood sheathing inside
finish; blanket insulation between studs and joists, sides and ceiling, 2° x 8*
redwood aheathing al) sides, with cutside aluminum covering top ami sides. Floor.
2'=3" below grade, slope t entrance, camplete with electric wiring & fixtures,
1
each
Direot
Indirect
/
Proration of
Charges to Unite
——}—-
Li i f
Number
.
.
COMPLETION REPORT FOR