ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO-.~30a
13-50)
AS-dUTL)
COMPLETION REPORT FOR
DRAWING NUMBER,
3E-5673,2
3/9/51
JOB NO,
ANU DATES:
CONTRACT NO. AT-1 29-1 )-h07
F29 = 19
For:
‘ee
LUCATION
sueeT no
__©7
"Not for use by A-E
DATE OF THIS REPORT:
EMIMETOK ATOLL
9 March 1951
The Complete Construction of Gollimator Base
Bbuitding No.: Station 8
7
ESTIMATE
Accuunt
Number
|
|
|
rESte REPTION OF
Quantity
PROPERTY UNITS
t'd. value
Furnished
Material
fonstrua tion
bs
Contras t
"UV,
Ss
Engineering
Cast
”
Total
f}$—__—--~— -_-_ .. -]
.
Proration ot
Charges to Units
|
B,R.L, REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
COLLIMATOR BASE, STATICN 8 OM SITE "D - ¥®
Reinforced consrete base 22'-0" x 9'~O* x4'-0" below grade,
above grade, anchored te base ani
oollimator blooke into proper position,
Structural steel
means for adjusting and clamping
Collimator blecks furnished by others,
Bach
Direct
Indirect
#,018, 56
3,553,458
$130,95
$9,702.99
7,463,812
3,676, 01
162,68
11, 302,50
COLLIMATOR BaSE, STATION & OM SITE "D - ¥"
Reinforced concrete base 22°-0* x 9'=08 x 4'-0" below grade, Structural steel
above grade, anchored to base and
ing means fro adjusting and clamping
eollimater blooks into proper position, Collisater blocks furnished by others,
Direct
Indrest
5
"PrUperty
or.
C
Thia dooume
pe Natty...
Arm ation Affecting
Emec Keates dey
wet
if ite CORtente
Mi here pateon ie
f° fet ev ere stiming?
he hitorgd Laws,”