COMPLETION REPORT FOR
JOB NO.
AS-8UILT DRAWING NUMBERS AND DATES:
28-188 1/19/51
2B-151
1/19/51
2B-3L7
28-438
1/19/51
1/19/51
2B=189
ATOMIC ENERGY COMMISSION
FE OPERATIONS OFFICE
SANTA
CONTRACT NO,
640 -1
For:
The Complete Construction of
Instrument Laboratory
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Account
DATE OF THIS REPORT:
19 Jamary 1951
211
Bullding No.:
1/19/51
*D,
Property
Quantity
Unit
1
Each
Construction
Contract
Cost
Est'd. Value
:
Gov. Furnished
Material
Engineerin
9
9
cost
Total
INSTRUMENT LABORATORY BUILDING
Une story aluminum construction; tee shaped; size I.D. 24'-O" x 128'-6 1/2" and
2h°~0" x 7'-8 1/2" x 12'-O" high; set on 5" thick concrete slab (1,000 square
feet only reinforced); double roof, separated by 2" x |" redwood; vented window
panels; aluminum partitions; with electrical services; plumbing; humidity control;
floor area 0.D. 5,179 square feet; cubic content 48,820 cubic feet.
and bing.
Benches
Installed equipment includes: One dehumidification unit, one drill press, one
grinder, one lathe, one shaper, one milling machine, one drill press — 3/16" to
3/4", one contour saw, one saw, one 3/ HP grinder, and one water cooler with
drinking fountain.
_or_ 68
“Not for use » eral of
LOCATION PARRY ISLAND = SITE "Bt
_AT-129-11-507