_ ATOMIC ENERGY COMMISSION
S10. 430
SANTA
(3.50)
FE
OPERATIONS
OFFICE
sweet No.QO or
COMPLETION REPORT FOR
AS BUTE] DRAWING NUMBERS AND LATES:
176-810
3/9/51
JOB NO. TRO = 15
CONTRACT NO,
-
For:
T
_AT~{ 29-1 }~bU?
LOCATION
The Complete Construction of
Building No.:
*Not
EMIWETOK ATOLL
for use by A-E
DATE QF THIS RFPORT:
9 March 1951
Gauge Mounts
Stations 33a thru 1, 34a thru 4
ESTIMATE
"brogeety |
—
—
:\
fecunt
feo
2...
eee
OE od |
o REPTION
RAPTIE
eto:
OF
> Fae
:
PROFERTY
UNITS
uanti
Quantity
i
tin it
ee
TEeoastrution|Est'd. Value
ntrrack
Font
4
|
—
ia OF aero sned
i
Engineering
Cost
——}f —
‘
Total
——
, NOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
|
GAUGE MOUNTS, STATIONS 330 THRU 1, SITE "Cc"
|
Steel stake, 2° diameter x 6'-O" long, with screw cap,
|
9
|
Each
Direct
|
Indirect]
$358,65
473,23
$14.99
$846, 27
997,58
68,92
2,523,939
1,591,65
135,26
60,37
2,407 ,28
530 ,57
251,47
28,19
$10,23
GAUGE MOUNTS, STATIONS 330 THRU 1, SITE*E®
Steel] stake, 2" diameter x 6'-0* long, with screw cap,
9
Bach
Direat
Indirect]
1,456,89
GAUGE MOUNTS, STATIOCUS 340 THRU d, SITE "C*
|
|
Steel stake, 2" diaseter x 6'-O" long, with screw cap,
4
Kach
Direct
Indirect
GAUGE MOUNTS, STATIONS 34a THRU d, SITE “E*
Steel atake, 2° diameter x 6'-O" long, with sorew cap,
4
Each
Direst
Indirect
“Proration
of
>
ono
Charges
to Unite
=
woe ee