ATOMIC
SANTA
Sh. daa
64.405
ENERGY
FE
COMMISSION
OPERATIONS
OFFICE
SaeEr..
COMPLETION REPORT FOR
729-18
yer
to
Bye
Ad-tatd-t barn
fo
T
notrac tion .t
or
St
oboe
ENTWETOK ATOLL
outti no 19
Noto
rate
75 Foot Towers
Tor
ob
use
by
OF
A..f%
Paice ER cr,
2 April 1961
Stations 60 and 62
[
cho
ele PLN GF
PROP: RT Y UNITS
|
Quantity |
.
Wait
,
: ote
t
- 4
hee
tla.
fo
val
yftit
Material
ne
-fied
Cre
tier ts rey
a
Mrooratiir ut
btarjes te Ming tes
at
UG KELUIKED CONSTRUCTICN AND LOCATION OF THE FOLLOWING STATIONS CONT,
15 FOOT TOWER, STATION NO, 60 ON SITE "Pp"
A steel tower, 4 legs horizontally and vertically cross braced, size O.D, 14'-3" x
14'-3" x 75'-O" nigh, erected on 4 reinforced concrete foundations and bases con-
nected by reinforced concrete tie beams,
aith reinforced concrete guy anchors.
mounted a ;refabricaled aluminum panel
six flight, checkered plate, stairway,
ground to a landing platform at top of
Eight 14" galv. steel cable guy wires
Tower topped with wood deck upon which is
cab, size 14'-3" x 14'-3" x 7'-0" high. A
2'-0" wide, with hand-rail, extends from
tower. A dumb-waiter is installed, on
outside of tomer, to operate from concrete pit at base of tower to cab floor.
An
electric winch, set on concrete base near tower, operatas the dumb-waiter with a
3/a" wire rope. Complete with electric wiring and fixtures including signal li-hta,
The
obatructicn lignts, grounding, lightning rod and telephone and signal cables.
installed ejutpment includes one hoist.
1
Each
Direct
Indirect
36,246.40
6,368.33
£144.21
£12, 758.7%
4 895 266
4,127.92
119.72
9,143.30
A steel] tower, 4 legs horizontally and vertically cross braced, size O.D, 14'-3" x
14'-3" x 75'-0" high, erected on 4 reinforced concrete foundations and basea connected by reinforced concrete tie beams. Eight 1;" galv. steel cable guy wires
with reinforced concrete guy anchors. Tower topped with wood deck upon which is
mounted & prefabricated aluminum panel cab, size 14'-3" x 14'-3" x 7'-O" high, A
six flight, checkered plate, stairway, 2'-O" wide, with hand-rail, extends from
ground to @ landing platform at top of tower, A dumb-waiter is installed, on
outside of towar, to operate from concrete pit at base of Lower to cab floor, An
electric winch, set on concrete base near tower, operates the dumb-waiter with a
3°" wire rope.
Complete with electric wiring and fixtures including signal lights,
obstruction lights, grounding, lightning rod and tele;hone and signal cables.
installed eyuipment includes one hoist.
The
2
Each
Direct
Indirect