ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO-43 4
‘3. 50)
aAS-BuilT ORAWING NUMBERS AND DATES:
461361
481361
2/6/51
2/6/51
CONTRACT NO.
JOB NO. 729-9]
730.2—9m
For:
The Complete Construction of
Bui Iding
oe
“Property
No.:
Quantity
DESCRIPTION OF PROPERTY UNITS
Number
STRUCTURE
oor__8
DATE OF THIS REPORT:
6 February 1951
SITE "S*
MUZIM -
Navy Type Structure
3.2.78 and 3-2-7b
-
Account
9
“Not for ue by A-E
LOCATION BEMGEBI - SITE *E*
AT-( 29-1 }-507
/
SHEET NO
wf
COMPLETION REPORT FOR
—
ESTIMATE
nn
—
.
Est'd, Value
Const ruc tion
Unit
Contract
Cost
Gov.
Furnished|
Material
7
oe
ee
Engineering
Cost
Total
3.2.
A reinforced concrete test structure, sise 0.D. 21'-0" x 41'-0" x 11'-6" above
grade, with 12" floor and foundation footings 3'-0" below grade, one end wall
opening with metal door.
i
each
Direct
Instrumentation
1, 156.96
Direct
Indirect
4,931.06
4,912.76
-O-
$18,891.91
2,264.69
12,108.53
12,669.7h
2, 264.69
31, 000.hh
Direct
Indirect
$19,279.67
12, 626.9)
-O-
31,906.61
Instrumentation
Direct
Indirect
4,i2h.h9
4,020.52
2,136.02
10, 261.02
Total Structure and Instrumentation
Direct
Indirect}
23,408.16
16,647.46
2,136.01
42,187.63
Total Structure and Instrumentation
STRUCTURE
$11,134.93
Indirect
Direct
Indirect
16,066.01
3.2.
A reinforced concrete test structure, size 0.D. 21'-0" x h1'-0" x 11'-6" above
grede, with 12° Moor and foundation footings 3'-0" below grade, ons end wall
opening with metal door.
1
each
“fae
.
a
|
Proration af
narges ta Units