Ban
a70.43 6
(3. 50)
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
90-607
9L=521
9L-S2e
9L-523
91-52
"Property
Account
Number
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
11/1/50
11/15/50
11/15/50 - 5/7/S\ ~ Revised
25/50
11/25/50 - 5/7/51 - Revised
JOB NO. G40 = 3n
CONTRACT NO,
For:
AT-( 29-—1 }—507
SMEET WO.
Sde@oeind,
“wot for use by A-E
LOCATION JAPTAN ISLAND — SITE "L*
DATE OF THIS REPORT:
25 Movember 1950
The Complete Construction of Fresh & Salt Water Systems, and Fresh & Salt
Building No.:
10
Water Storage Tanks
Revised:
7 May 1951
ESTIMATE
Quantity
DESCRIPTION OF PROPERTY UNITS
Unit
Construction
Contract
Cost
Est'd,
Value
Gov. Furnished
Material
or_22
23
Engineering
*Proration of
Charges to Units
Cost
Total
$165.51
$3,395.22
$179.31
$37,261.19
FRESH WATER PIPING SYSTEM ~ Outdoor
Pipe, 3" Transite Pressure 150# underground 2'-6" min,, 3,300 lin. ft.; Pipe,
4" Galvanised Steel, 75 lin. ft.; Pipe, 2" Galvanized Steel, 40 lin. ft.; Services,
Water-Copper Pipe, 1 eachs One tank, bolted steel construction with cover, 1,200
gallon capacity, set on a reinforced concrete pad, size 10'-O" x 10'-0* x 6",
One tank, pressure reducing, welded steel construction, size 5'-0" x 7'-0" x
5'~0O", mounted approximately 75% below grade level.
Systen
Direct
Indirect
$15 sh29 053
15,800.18
SALT WaTER PIPING SYSTEM - Outdoor
Pipe, 4" Transite Pressure 150# underground 2'-6" min., 3,300 lin. ft.; Pipe, 3”
Transite Pressure 150# underground 2'-6" min., 300 lin. ft. Pipe, 8" Corrugated
Metal, 100 lin. ft.3 Services, Water-Copper Pipe, 46 each.
One tank, pressure
reducing, welded steel construction, size 5'-O" x 7'-O" x 5'-O%, set on a
reinforced concrete pad, size 7'-O" x 9'-0" x 6", One tank, presmre reducing,
welded steel construction, size 5'-0" x 7'-0" x 5'-0", mounted approximately
75% below grade level.
System
Direct
Indirect
KLEVATED WATER TANKS - Bldg.
$19,965.32
17,116.86
Two bolted steel tanks, each 4,200 gallon capacity, mounted on 15'=|2" x 27'-9 1/2"
tower platform elevated 30'-65" above grade. Platform consists of 2" x 8"
inclosed by 2" x k" guard rail 3'-6" high, and mupported by h" x 12"
joists on 10* x 18" caps over 10" x 10" columns with 2" x 6" double diagonal
bracing, concrete footings below columns.
salt water and fresh water syetens.
Piping and valves connecting tanks to
CAI
TOWER AND TANK — FRESH WATER STAND-BY
“Thin docu
the Natin
transmine
Welded steel tank, sise 5'-0" x 7'~O" x 5'-O", 1,300 gallon capacity, mounted on
a 12'-0* x 12'-O* tower platform elevated 12' above grade. Platform consists of
2° x 12"
over &" x 6" beama supported by four 8" x 8" columns set on
6" x 8" sills. Piping and valves connecting tank to pysten.
TOTAL - Distillation Equipment
Shown in Bldg. Mo. 12
Séateiial
im any ma
ong
fen
tT 10 @
prohibited"and may
prmalties vader app
Direct
Indirect
$1,828.23
Direct
Indirect
$69,735.69
305.86
$18.55
$2,152.64
14,945.35
$790.39
$55,472 043