.
SFO. 43 6
(3. 80}
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
AS- BUILT ORAWING NUMBERS AND DATES:
13-225
9/27/50
JOB NO,
CONTRACT NO.
For:
Location Only
“Property
LOCATION
SMEET NO.
Buliding No.:
18
OF.
2
"Not for use by A-E
JAPTAN ISLAND —- SITE “L"
DATE OF THIS REPORT:
27 September 1950
The Compiete Construction of
Sh-55-56-57-58-59, Constructed and Occupied by
U.S. Navy Personnel
ESTIMATE
Quantity
DESCRIPTION OF PROPERTY UNITS
Account
AT-( 29-1 1-507
Ser
Unit
Construction
Contract
Estid. Value
furnished
Gov.
Engineering
Cost
Total
*Proratlon
Charges to ofunits
DAY OOM BUILDING - Bldg. $5)
Sise 0.D. 16'-0" x 56'-0%, elevated 2k" above grade, wood frame, siding and
foundation) ecrrugsted metal roof. Klectric light and power service, piping for
Plumbing, fresh water and sewer. Installed equipent and furnitures includes:
Que reach-in refrigerator (Army surplus), one walk-in refrigerator, 13 wood and
canvas folding chairs, one banquet table, and two fire extinguishers.
1
Keach
*
1
Kaoh
*
2
Each
*
1
Each
*
i
Each
*
Each
CA UTIO N
“This docum
i
the National
OFFICE BUILDING — Bldg. #55
Sise 0.D. 14'-0" x 16'-0", elevated 24" above grade, wood frame, siding and
foundation; corrugated metal roof. Electric light anid power services, piping for
plumbing, fresh water and sewer. Installed equipsent and furniture inciudes:
One aluminum hot locker, one wood and canvas folding chair, and one fire
extinguisher.
Fip@T AID BUILDING - Bldg. $56
Size 0.D. 1h'-0" x 10'-0", elevated 2)" above grade, wood frame, siding ani
foundation; corrugated metal roof. Electric light and power service. Piping
for plumbing, fresh water and sewer. Installed equipment and furniture includes:
One wood and canvas folding chair, and one fire extinguisher.
DRAFTING ROOM BUILDING - Bldg. #57
Sise 0.D. 12'=0" x 2h'~0", elevated 2h" above grade, wood frame, siding and
foundation; oorrugated metal roof. Electric light and power service.
equipment includes: One fire extinguisher.
BIOLOGICAL LABORATORY
=
Installed
°
Sise 0.D. 127-0" x 30'-0", elevated 2)" above grade, wood frame, siding and
foundation; corrugated metal roof,
for plumbing, fresh water and sewer.
extinguisher.
Electric light and power service.
Installed equipment includes:
Piping
One fire
QUaRTERS ~- TOLLET BUILDING — Bldg. £5
Sise 0.D. 14'-0" x 21,'-0", elevated 2" above grade; wood frame siding and
foundation; corrugeted metal roof. Klectric light and power service. Piping
for plumbing, fresh and salt water and sewer.
# Bo cost recorded for this structure.
S
1
prohibited