,
SFO. 430
(3. 80)
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
AS- BUILT DRAWING NUMBERS AND OATES:
oleae
JOB NO,
Rio
640 - 3s
CONTRACT NO. 29-1
For:
The Complete Construction of
Building No.:
LOCATION
DATE OF
Infirmary
9 Dec
THIS REPORT:
F 1950
52
"Property
DESCRIPTION OF PROPERTY UNITS
AG or_29
*Not for use by a-E
JAPTAN ISLAND ~ SITE "L"
_
Account
SHEET No.
PORT T
COMPLETION REPORT FOR
Quantity
Unit
ESTIMATE
Construction
Contract
Est'd.
Value
OOMeta
Engineering
Cost
Total
-—
INFIRMARY
Qne story frame construction; roof and siding corrugated alusinus; rectangular
ahape; sise 1.D. 19'=11 U/" x 23'21 1/k" x 12'=0", set on a 5" reinforced
concrete slab.
Includes electrical wiring, plumbing, storage cabinets, bench,
ahelving, screened doors and windows.
Floor area 0.D. 507 aq. ft., cubic content
I.D. 4,773 cu. ft., concrete pads, 5" thick, 4'-O" x 10'-O" and 4'-0" x 5'-08,
total 60 sq. ‘, Installed equipment and furniture includes: One glass instrument cabinet, one 16" x 33" metal table, one operating table, one fire extinquisher, and one refrigerator.
1
Each
Direct
Indirect
$5,385.37
4,671.83
oe
$10,057.20
*Proration of
Charges to Units