ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 430
(3. 50)
AS-BUILT
a
COMPLETION REPORT FOR
JOB NO.
ORAWING NUMBERS AND DATES:
640
CONTRACT NO,
F.S. = 120
For:
AT-i 29-i )-507
"Not for use by A-E
Page 142
DATE OF THIS REPORT:
LOCATION PARRY ISLAND - SITE "B*
The Complete Construction of
Building No.:
sweet wo. 8 oF48
Garbage Can Wash House
150
ESTIMATE
“py
rt
Account
Number
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Construction
Contract
Cost
Est'd. Value
Gov. Furnished
Material
.
Engineering
Total
GARJAGE CAN AASH HOUSE - Building #150
One story wood construction; rectangular shape; sise 0.D. 10'-5 1/l" x 10'-8 3/4"
x 10'=0"; set on 6" x 6" concrete curb on 5" thick reinforced concrete slab,
10'=7 1/4" x 1h'-10 3/l", elewated h'-O" above grade; slab on compacted sand fill
and concrete retaining walls; concrete ramp - '-O" = 10'-O" from grade to floor
elevation; floor sloped to drainage pit at end of building.
framing with 3/4" plywood to a height of 4'-0" above curbing.
Walls 2" x 4"
Upper portion of
walls of insect proof plastic screen. Roof 2" x i" rafters, 1" x 6" purlins
and corrugated aluminum roofing. Electric service; plumbing and steam piping.
Floor area 158 square feet; cubic contents 910 cubic feet; ramp area 0 square
feet.
1
Each
Direct.
Indirect
Sarr
$1,582.10
1,888.62
$3,771.02
*
Charges to Unite